BGC Home  About BGC  Services  Safety/Programs  Projects  Contact
 

Buckeye Gulf Coast Pipe Lines, L.P.

Project Summaries

 
Design
Seagull Shoreline System-50 miles of 12” and 24” two-phase gas pipeline in state waters off the Texas Gulf Coast

Cavallo-44 miles of 20” and 16” gas pipeline, connecting production platforms to onshore pipelines in the Texas Gulf Coast
 
Build
Quantum-74 miles 10” and 8” products pipeline (Deer Park to Mont Belvieu).

Granite Point-17 miles of 16” gas transmission line, Granite Point, Alaska to Beluga, Alaska.
 
Own
Huntsman-280 miles of 8” and 6” products pipeline, meter stations and pump stations. Originally built as a joint venture between BGC and Texaco Chemicals. Huntsman purchased the pipeline later when economic conditions were favorable. BGC still operates the system today.

Sabina Petrochemicals- Built 90 miles of 8” pipeline from Deer Park to Port Arthur as majority owner and following commissioning will operate and maintain.
 
Operate
American Acryl-Complete construction of nine pipelines associated with grassroots acrylic acid plant in Bayport, Texas. BGC operates and maintains eight of these pipelines.

DuPont-18.5 miles of 4” pipeline in Louisiana, Shell at Norco to DuPont at Pontchartrain.
 
Maintain
Westlake Petrochemicals-BGC is responsible for maintenance and calibration of meter stations in Texas.

Huntsman-BGC provides full maintenance services for several inter-plant pipelines in the Port Arthur/Port Neches area for Huntsman.