| BGC Home About BGC Services Safety/Programs Projects Contact |
Buckeye Gulf Coast Pipe Lines, L.P. |
|
Project Summaries |
|
| Design | |
![]() | Seagull Shoreline System-50 miles of 12” and 24” two-phase gas pipeline in state waters off the Texas Gulf Coast Cavallo-44 miles of 20” and 16” gas pipeline, connecting production platforms to onshore pipelines in the Texas Gulf Coast |
| Build | |
![]() | Quantum-74 miles 10” and 8” products pipeline (Deer Park to Mont Belvieu). Granite Point-17 miles of 16” gas transmission line, Granite Point, Alaska to Beluga, Alaska. |
| Own | |
![]() | Huntsman-280 miles of 8” and 6” products pipeline, meter stations and pump stations. Originally built as a joint venture between BGC and Texaco Chemicals. Huntsman purchased the pipeline later when economic conditions were favorable. BGC still operates the system today. Sabina Petrochemicals- Built 90 miles of 8” pipeline from Deer Park to Port Arthur as majority owner and following commissioning will operate and maintain. |
| Operate | |
![]() | American Acryl-Complete construction of nine pipelines associated with grassroots acrylic acid plant in Bayport, Texas. BGC operates and maintains eight of these pipelines. DuPont-18.5 miles of 4” pipeline in Louisiana, Shell at Norco to DuPont at Pontchartrain. |
| Maintain | |
![]() | Westlake Petrochemicals-BGC is responsible for maintenance and calibration of meter stations in Texas. Huntsman-BGC provides full maintenance services for several inter-plant pipelines in the Port Arthur/Port Neches area for Huntsman. |